DBE Vector Field
Pi: 3,720 psi
Pb: 1,488 psi
Reservoir Topology
West Texas Basin (8,000 ft)
Production Rate & Pressure Decline
Rate (bbl/d)
Pressure (psi)
Bubble Point
AI Engineering Insight
Configure Phases 1 & 2, place vectors, then click "Phase III: Analyze" to generate physics-based forecasting.
P90 (Conservative)
0 k
P50 (Nominal)
0 k
P10 (Optimistic)
0 k
DBE Vector Field
Pi: 3,720 psi
Pb: 1,488 psi
Reservoir Topology
West Texas Basin (8,000 ft)
Production Rate & Pressure Decline
Rate (bbl/d)
Pressure (psi)
Bubble Point
AI Engineering Insight
Configure Phases 1 & 2, place vectors, then click "Phase III: Analyze" to generate physics-based forecasting.
P90 (Conservative)
0 k
P50 (Nominal)
0 k
P10 (Optimistic)
0 k